Project
Puck Em’ Back
- Power distribution architecture, protection strategy, and staged testing (built from scratch).
My scope
- Designed power distribution plan (loads, rails, headroom)
- Protection: fusing, switches, ratings, failure modes
- Validation plan: staged bring-up + load testing
Artifacts (coming next)
- System overview diagram
- Component list + ratings table
- Test checklist + results